2.0

Table Of Contents
Editing Conceptual Plan Pipe Runs Using the Pipe Run Editor
681
Adding Surface Runoff Contributions to Pipe
Nodes or Segments
To add surface runoff contributions to pipe nodes or segments
1 From the Pipes menu, choose Conceptual Plan ä Edit Data.
2 Do one of the following:
n
Select the run with your pointing device.
n
Press ENTER to open the Defined Runs dialog box and select the run, then
click OK.
All pipe runs are stored in a single Pipeworks database called pipeworks.mdb.
After you select a run, the Pipeworks database is automatically searched for the
run with the specified name.
NOTE
The .mdb file is a Microsoft Access file, so you can view the .mdb file
using Microsoft Access.
After the pipe run is found, the Pipes Run Editor dialog box is displayed with
the selected pipe run data. For more information, see Changing the Pipe Run
Editor Settings in this chapter.
3 Place your cursor in the Surface Flow column, and then click Runoff to display
the Runoff dialog box.
4 Select the Runoff check box.
5 Do one of the following to select a file:
n
In the File box, enter the filename of an existing surface runoff output file.
n
Click the Select button to display the Runoff Method Selection dialog box.