2.0

Table Of Contents
Editing Conceptual Plan Pipe Runs Using the Pipe Run Editor
667
3 Click Settings to display the Pipes - Editor Settings dialog box.
4 Click Precision to display the Precision Settings dialog box.
5 In the appropriate text boxes, type a value, or use the slide box associated with
each option to select the precision value you want.
6 After adjusting the settings, click OK to exit the dialog box.
Calculating Hydraulic and Energy Gradelines
You can calculate hydraulic and energy gradelines within the Pipes  HGL/EGL
Settings dialog box.
To calculate hydraulic and energy gradelines
1 From the Pipes menu, choose Conceptual Plan ä Edit Data.
The following prompt is displayed:
Pick run:
2 Do one of the following to select a run:
n
Select a run with your pointing device.
n
Press ENTER to open the Defined Runs dialog box.
Under Selection, select the defined run, and then click OK.
All pipe runs are stored in a single Pipeworks database called pipeworks.mdb.
After you select a run, the Pipeworks database is automatically searched for the
run with the specified name.
NOTE
The .mdb file is a Microsoft Access file, so you can view the .mdb file using
Microsoft Access.
3 Click the Settings button to display the Pipes - Editor Settings dialog box.