2.0

Table Of Contents
Importing Conceptual Pipe Runs into a Drawing
659
Checking for Defined Pipe Runs in a Drawing
To check for defined pipe runs in a drawing
1 From the Pipes menu, choose List Defined Runs to display the Defined Runs
dialog box.
2 In the Selection box, select a pipe run to set as current, then click OK to continue.
Identifying Pipe Runs in a Drawing
Use the Identify Run command to identify a selected pipe run in the drawing.
When you select a run, a prompt displays its run, length, and number of nodes.
To identify pipe runs in a drawing
1 From the Pipes menu, choose Identify Run. The following prompt is displayed:
Pick run:
2 Select a point on an existing pipe run.
The following information is displayed:
Run: {name} length: {#} nodes: {#}
If the selected entity is not a pipe run, then the following message is displayed:
Entity selected not attached to valid run.
Importing Conceptual Pipe Runs into a Drawing
You can import conceptual pipe runs into a plan or profile view.
Importing Conceptual Pipe Runs into Plan View
Use the Import Run command to import pipe runs from the database into the
drawing.