2 From the Plot Settings dialog box, select a curve from the Curve Information
list. If no curves are listed in the list, refer to the preceding note.
3 Click Preferences next to the the curve list. The Individual Curve Preferences
dialog box is displayed for the curve you selected in step 1.
4 You can change the preferences for the curve by specifying the following
settings:
n
X-Y Line: From this list, select a method for illustrating the curve on the
graph. The available options are: X-Y Line - displays the curve as a line,
Symbol - displays the curve as a series of symbols, X-Y Line & Symbol -
displays the curve as a line and symbols, or Bar - displays the curve as a bar
graph.
n
Layer: Enter the name of the layer on which you want to place the curve.
n
Color: Enter the number of the layer color that you want the curve displayed
in, or pick the colored box and select the color from the standard Select
Color dialog box.
n
Symbol: Enter the name of the symbol that you want to use to illustrate the
curve, or click Select and select a symbol from the Select Block dialog box.
The blocks must have a scale of one to one (1:1).
5 You can change the X and Y values for the curve by clicking Edit to display the
Edit Data dialog box.
6 Click OK to return to the Plot Settings dialog box.
Changing X,Y Data for an Individual Curve
You can change X and Y values for an individual curve.
To change the X,Y data for an individual curve
1 Click the Plot button from the hydrograph you are currently viewing to display
the Plot Settings dialog box.
NOTE
You can view a hydrograph when you are using several different
commands. For example, if you select Hydrology ä Runoff ä Rational, and
then click the IDF button and the View button, a hydrograph is displayed.