2.0

Table Of Contents
Editing Subassemblies
295
After the subassembly is imported into the drawing, the following prompt is
displayed:
Delete/Insert/Next/SAve/Previous/SRfcon/Move/Redraw/eXit <Next>:
4 Type I for Insert to insert a vertex.
You are prompted to enter a new location for the vertex.
5 Select a point in the drawing, or enter the absolute X,Y coordinates for the new
vertex location. You can use object snaps to accurately select a point in the
drawing. A new vertex is inserted at the point you pick.
NOTE
Use object snaps to select a point in the drawing accurately.
NOTE
If the new vertex is part of the datum line, then use the SRfcon option in
the Edit Subassembly command to redefine the datum points.
Moving a Subassembly Vertex to a New Location
The Move option of the Edit Subassembly command relocates the current vertex
by selecting a new point.
To move a subassembly vertex to a new location
1 From the Cross Sections menu, choose Templates ä Edit Subassembly to display
the Subassembly Librarian.
2 Pick the subassembly you want to edit, and then click OK.
You are prompted to pick an insertion point in the drawing.
3 Pick an insertion point for the subassembly in the drawing.
The subassembly is imported into the drawing at the location you picked using
the connection-point-in on the subassembly as the point of reference. The
command draws the subassembly as a 2D polyline and highlights the datum
line on the subassembly in a different color. The command places an X at the
first vertex on the polyline. It uses the X to indicate the vertex that can be
edited or moved.
After the subassembly is imported into the drawing, the following prompt is
displayed:
Delete/Insert/Next/SAve/Previous/SRfcon/Move/Redraw/eXit <Next>:
4 Type M for Move to move the current vertex.
The command prompts for the new location of the vertex.
5 Pick a point in the drawing, or enter the absolute X,Y coordinates.
NOTE
Use object snaps to select a point in the drawing accurately.
The vertex is moved to the point you picked.
NOTE
If the new vertex is part of the datum line, then use the SRfcon option in
the Edit Subassembly command to redefine the datum points.