2.0

Table Of Contents
Creating Vertical Alignment Reports
173
Changing the Surface Elevations with the
Vertical Alignment Editor
You can apply an elevational change to a range of stations on a vertical
alignment by using the Vertical Alignment Editor.
To change the surface elevations with the Vertical Alignment Editor
1 Display the Vertical Alignment Editor dialog box in one of the following ways:
n
From the Profiles menu, choose FG Vertical Alignments
ä
Edit.
n
From the Profiles menu, choose DT Vertical Alignments
ä
Edit.
n
From the Profiles menu, choose Existing Ground
ä
Edit Vertical Alignment.
2 From the Vert. Alignment list, select the alignment you want to edit.
3 Click Edit Elevs to display the Edit Surface Elevations dialog box.
4 In the Beginning Station and Ending Station boxes, specify the station range to
which the elevation change is applied.
5 In the Elevation Change box, specify the increment by which to change the
elevation.
Enter a positive value to move all the elevations up (do not use a plus sign (+)
symbol), or a negative value to lower the elevations to move all the elevations
down.
6 Click OK.
Creating Vertical Alignment Reports
From within the Vertical Alignment Editor, you can generate reports that list
station, curve, and incremental information about a selected vertical alignment.
Changing the Vertical Alignment Report Settings
To change the vertical alignment report settings
1 Display the Vertical Alignment Editor dialog box in one of the following three
ways:
n
From the Profiles menu, choose FG Vertical Alignments
ä
Edit.
n
From the Profiles menu, choose DT Vertical Alignments
ä
Edit.
n
From the Profiles menu, choose Existing Ground
ä
Edit Vertical Alignment.
2 Under Reports, click Settings to display the Output Settings dialog box.
NOTE
The Vertical Alignment Editor always generates the report data to a file,
whether or not you select or clear File and Screen under Output Options.
3 Under Output Format, select or clear the appropriate check boxes:
n
Date: Select this check box to place the date on the report.
n
Title: Select this check box to place a title on the report.