User manual
Table Of Contents
- Contents
- Autodesk® Buzzsaw
- Buzzsaw
- Welcome
- Accessing Your Site
- Read Me
- Getting Started
- Navigating the Workspace
- Site and Project Administration
- Archiving Site, Project, and Folder Contents
- Cloning a Project
- Granting Anonymous Public Access
- Converting Project and Standard Folders
- Project Properties
- Ownership of a Project, Folder, or File
- Working with Site and Project Statistics
- Site Administrator Tasks
- Welcome Email Options
- Managing Site Information Pages
- Creating a New Member
- Editing a Member
- Adding a Member to a Project
- Importing and Exporting Members
- Creating a Group
- Project Administration Tasks
- Adding a Member to a Project
- Editing Members of a Project
- Groups
- Permissions
- Activity Logs
- Information Pages
- Folders
- Files
- About Project Files
- Using the View Tab
- Using the Discussions Tab
- Using the Versions Tab
- Using the Markups Tab
- Using the Form Links Tab
- Adding a File
- Editing a File
- Deleting a File
- Viewing a File
- Adding a Note
- Adding a Link to a Folder or File
- Adding a Link to a Note
- Downloading a Folder or File
- Locking and Unlocking a File
- Recovering a File
- Renaming a File
- Updating a File
- Working with Multiple Views
- Using Properties
- Versions
- Discussion Threads
- Drawings
- External References (Xrefs)
- Find
- Notification Manager
- Recycle Bin
- Viewers and Markups
- Buzzsaw Professional
- Overview of Buzzsaw Professional
- Project Setup
- Global Collaboration
- Dashboard Overview
- Forms Setup
- Working with Form Logs, Workflow and Roles
- Working with Forms
- Adding a Form
- Adding a Comment to a Form
- Viewing a Form
- Editing a Form
- Printing a Form
- Linking Documents to a Form
- General Tab for Forms
- Routing Tab for Forms
- Links Tab for Forms
- Attachments Tab for Forms
- Discussions Tab for Forms
- Versions Tab for Forms
- History Tab for Forms
- Assigning/Re-assigning a Form
- Responding to a Form
- Recalling a Form
- Closing a Form
- Deleting a Form
- Working with Reports
- Working with Submittal Packages
- Bid Management
- Document Register
- Support Options
- Support Options
- Glossary
- Reference
- Using Accessibility Shortcuts
- Logging In and Password Dialog Boxes
- File and Folder Dialog Boxes
- Using the Folder Properties General Tab
- Project Folders
- Standard Folders
- Working Folders Dialog Box
- Recover Folder
- Using the File Properties General Tab
- Download Folder Dialog box
- Recover File
- Ownership Dialog Box
- New Notification Dialog Box
- New Notification Dialog Box
- Automatic Notification File Types
- Daily Summary Time Dialog Box
- Updating Your Time Zone
- File Types that are Indexed
- Supported Bitmap Files
- Forms Display Issues
- Enter URL Address
- Drawings and Viewers Dialog Boxes
- Project Dialog Boxes
- Add/Update to Project - Select Drawings Wizard
- Add/Update to Project - Edit Attributes Wizard
- Add/Update to Project - Import Attribute Template Wizard
- Add/Update Project Documents Wizard - Attach Comment
- Add/Update Project Documents Wizard - Send Email Notification
- Add to Project - Create Note Wizard
- Add to Project - Create Link Wizard
- Preferences and Settings Dialog Boxes
- Email Dialog Boxes
- Site and Project Administrator Dialog Boxes
- Site Administrator's Minimum Required Version Dialog Box
- Member Information Contact Tab
- Active Members Dialog Box
- Remove a Member
- Confirm Member Delete
- Export Permissions As Dialog Box
- Add to Group Dialog Box
- New Group Wizard: Step 2 Select Members
- New Group Wizard: Step 3 Project Memberships
- Select Group Dialog Box
- Add Project Members Dialog Box
- Add to Project Dialog Box
- Activity Log List Options Dialog Box
- Print Activity Log
- Save Activity Log
- Add Information Page Dialog Box
- Import/Export — Select Fields
- Import/Export Members - Import Field Mapping Step
- Import/Export - Select Members Step
- Import/Export Members Wizard
- Import/Export - Send Email Step
- Select Company Dialog Box
- Filter by Company Dialog Box
- Password Requirements
- Add/Remove Roles Dialog Box
- Index
5 Add any additional comments if desired.
6 Click Send.
The bidder is notified that you have sent an intent to bid. You can now submit
your bid. Follow the steps in the next section of this topic.
Submitting a bid
1 Navigate to the Bid Management dashboard.
2 Click the name of the bid invitation to review the invitation details.
3 Click the Submit Bid Now button. The Add Bid window is displayed.
4 Select either Local Files or Project Files from the drop-down list.
You can upload single or multiple files.
NOTE If you select a file from your Buzzsaw site a copy of the file is attached
to the package. Thus, if the file on the site changes, the attached file is not
updated.
5 Click the Browse button to navigate to the files that you want to add
to the bid. The files are displayed.
6 Click Submit when you are finished. The bid is submitted to the bid
administrator.
Once a bid is submitted you can view your submitted bit in the Bid
Management dashboard in the Submitted Bids tab. From the dashboard you
can update or remove the bid.
Removing a bid
Once you have submitted a bid you can remove it.
1 Navigate to the Bid Management dashboard.
2 Click the name of the bid invitation. The bid package details are
displayed.
3 Click the Bid Packages (page 360).
4 Select Remove Bid from the drop-down list. Your bid is removed from
the bid package.
Bid Management | 357










