2011

Table Of Contents
SPLINEDIT adds a new control vertex close to the point you select, between
the two control vertices affecting that portion of the spline.
Delete
Decreases the number of control vertices that define the spline.
Elevate Order
Increases the number of control vertices on the spline.
Entering a value greater than the current value increases the number of control
points uniformly across the spline for more localized control. The maximum
value is 26.
Move
Relocates a spline's control vertices and purges the fit points.
New Location on page 1836
Next on page 1837
Previous on page 1837
Select Point on page 1837
Weight
Changes the weight at various control vertices. A larger weight value pulls the
spline closer to the control vertex.
New Weight Recalculates the spline based on the new weight value at the
selected control point. The larger the integer value, the more the spline is
pulled toward the control point.
Next on page 1837
Previous on page 1837
Select Point on page 1837
1838 | Chapter 19 S Commands