2011

Table Of Contents
3 To create a workflow that uses a single data store, do the following:
Drag the Connect To Data Store activity to the diagram area in the
Workflow Designer (where you see Drag And Drop Map Activities
Here).
Optionally, create a layer for the connection by dragging a Create
Feature Layer activity just below it.
4 Add any other desired activities.
For information about the available activities and their parameters, see
Workflow Activity Input dialog boxes (page 2025). For a tutorial on
workflows, see Lesson 5: Edit a Predefined Workflow.
NOTE To set parameters for some utility activities (For Each, If/Else, and
While), click
in the Workflow Designer toolbar. In the Properties palette
that displays, click the cell for the parameter to set. Click the browse button
that appears to select parameters from a list, if available.
5 Save the workflow by clicking
at the top of the Workflow Designer
window.
Workflows saved in AutoCAD Map 3D 2011 format cannot be opened
in AutoCAD Map 3D 2010. To use your workflow with AutoCAD Map
3D 2010, make sure that the workflow contains only activities that were
supported in that version. Then use Save As and change Save As Type to
Map 3D 2010 Workflow File. To maintain the version formatting, you
must continue to use the 2010 Save As option each time you save the
workflow
6 Click
to run the workflow from within the Workflow Designer,
which validates the activities.
As each activity executes successfully, a green check mark appears at the
top right corner of the activity box. If an exclamation mark appears
instead of the check mark, the activity is missing a parameter. If a red X
appears, the activity failed. Click the link in the Workflow Status area (at
the bottom of the Workflow Designer window) to see the log.
7 Optionally, click
to print the workflow.
288 | Chapter 2 Setting Up