2013

Table Of Contents
IntegerType:
RegistrySaved in:
2Initial value:
The status data for layouts in the current project includes whether a layout is
locked and whether a layout is missing (or found in an unexpected location).
This status data can be updated automatically for all layouts.
Do not automatically refresh the status data in a project0
Refresh the status data when the project is loaded or updated1
Refresh the status data when the project is loaded or updated, or
at a time interval set by SSMPOLLTIME (page 1492)
2
See also:
Create and Modify Layouts in a Project
SSMSTATE
Indicates whether the Project Manager window is open or closed.
(Read-only)
IntegerType:
Not-savedSaved in:
VariesInitial value:
Closed0
Open1
See also:
Create a Project
STATUSBAR
Controls the display of the status bar.
S System Variables | 1493