2011

Table Of Contents
If you change any of the SHDWGNAM data, the Dwg no.
(%D) field for that drawing can be updated to match.
SHDWGNAM
If you change any of the IEC_P data, the IEC Project (%P)
field for that drawing can be updated to match.
IEC_P
If you change any of the IEC_I data, the IEC Installation
(%I) field for that drawing can be updated to match.
IEC_I
If you change any of the IEC_L data, the IEC Location (%L)
field for that drawing can be updated to match.
IEC_L
If you change any of the SH-DESC data, the Description
data held in the project file (.WDP) can be updated to
match.
SH-DESC
Update Configuration Changes
Ribbon: Project tab Other Tools panel Settings List
Utility.
Menu: Projects Extras Settings List Utility
Command entry: AEDWGCFG
1 Click Edit Mode.
2 Edit the values or change the drawing order.
3 Click OK-Return to Report.
4 Click Close.
If you edit the information in the Configuration Report, you have an option
to update the project and drawings with the new information. Re-order the
lines with the Move Up, Move Down, Move to Top, and Move to Bottom
buttons. If you re-order the lines, the order of the drawing list in the project
file (.WDP) can be updated to match.
Update the drawing order in the project file (.WDP).Drawing Order (in .WDP)
Update the Section data held in the project file (.WDP).Section (in .WDP)
Settings List Utility | 243