2011

Table Of Contents
Ribbon: Project tab Other Tools panel Settings List
Utility.
Menu: Projects Extras Settings List Utility
Command entry: AEDWGCFG
Click Edit Mode.
If you edit the information in the Configuration Report, you have an option
to update the project and drawings with the new information. Re-order the
lines with the Move Up, Move Down, Move to Top, and Move to Bottom
buttons. If you re-order the lines, the order of the drawing list in the project
file (.WDP) can be updated to match.
Moves the currently selected lines up one place in the re-
port.
Move Up
Moves the currently selected lines down one place in the
report.
Move Down
Moves the currently selected lines to the top of the report.Move to Top
Moves the currently selected lines to the bottom of the re-
port.
Move to Bottom
Edit
Edits the values of the currently selected line. Double-click any line to go
directly into edit.
Specifies the drawing name.DWGNAM
If you change any of the Sec data, the Section data held
in the project file (.WDP) can be updated to match.
SEC
If you change any of the SubSec data, the Sub-Section data
held in the project file (.WDP) can be updated to match.
SUBSEC
If you change any of the SH data, the Sheet (%S) field for
that drawing can be updated to match.
SH
242 | Chapter 4 Drawing and Project Properties