2 In the Project Manager, double-click AEGS to expand the drawing list.
3 Open AEGS11.dwg.
4 Click Reports tab Schematic panel Reports.
5 In the Schematic Reports dialog box, select:
Report Name: Bill of Material
Bill of Material: Project
Verify that the following options are specified:
Include options: All the above
Display option: Normal Tallied Format
Installation Codes to extract: All
Location Codes to extract: All
Click OK.
6 In the Select Drawings to Process dialog box, select AEGS03.DWG, and
click Process.
7 Verify that AEGS03.DWG displays in the Drawings to Process section of
the dialog box and click OK.
The generated report displays in the Report Generator dialog box.
8 In the Report Generator dialog box, select:
Header: Time/Date
Header: Column Labels
Add blanks between entries
1870 | Chapter 23 Tutorials