2011

Table Of Contents
7 Click Schematic tab Edit Components panel Edit Components
drop-down Edit.
8 Select the bottom terminal on rung 218. The Insert/Edit Terminal Symbol
dialog box displays.
9 In the Insert/Edit Terminal Symbol dialog box, Project List section, select
Tag Strip TB.
10 Enter Location: MCAB5 and Number: 12.
11 On the Insert/Edit Terminal Symbol dialog box, Modify
Properties/Associations section, click Add/Modify.
12 On the Add/Modify Association dialog box, Select Association section,
expand the active project node.
13 Select the terminal block node you inserted on line reference 217 (10,11,
(3)). Notice that the node properties updated to reflect that levels 1 and
2 are assigned and that level 3 is still blank/available.
14 Select Level 3 in the grid and click Associate.
Once you click Associate, the bottom level updates with the terminal
number in the grid in the Active Association section of the dialog box.
You can rearrange the levels by selecting a level and clicking Move Up
or Move Down.
Modify multi-level associations | 1829