2011

Table Of Contents
next to the Open button and select one of the following
options: Open (Check Out), Open (Check Out All), or Open
Read-only.
Buttons
Creates a project. Once created, the new project
automatically becomes the active project.
New Project
Creates a drawing file and adds it to the active
project.
New Drawing
Refreshes the drawing list inside of the Project
Manager.
Refresh
For Vault: Checks for changes in external file
references and updates the Vault icons in the
Project Manager. Files that have changed and
are currently checked out to you are not up-
dated. Files that are checked out to someone
else are updated to their current version. Files
that are checked out to someone else are up-
dated to their current version on your local drive.
If the Vault version is newer, then the Vault icon
indicates that the file needs reloading (the Vault
icon turns red).
Performs pending updates on any drawing files
inside of the active project that have been mod-
ified.
Project Task List
Updates the related line reference numbers,
cross-reference text, device tagging, and signal
Project-Wide Update/Re-
tag
reference updates on the selected drawing files
inside of the active project.
Configures the display options. There are ten
values that can be associated with the drawings
Drawing List Display Con-
figuration
listed so you can display the information based
on your requirements.
160 | Chapter 3 Project Management