Copy project: step 1 - select existing project to copy
Ribbon: Project tab Project Tools panel Copy.
Toolbar: Project
Menu: Projects Project Copy Project
Command entry: AECOPYPROJECT
NOTE If the active drawing is one of them to copy to a new project, cancel the
dialog box, open a new drawing, and then restart the Copy Project command.
Copies the active project.Copy Active Project
Selects another project to copy.Browse
About collaborative design
In a collaborative design environment, several people can work on a project
at the same time. The project file (.WDP) lists all the drawings that are part
of a project. You can use Autodesk Vault with AutoCAD Electrical for drawing
management, version control, and revision labeling.
You must install Autodesk Vault to vault projects. Autodesk Vault prevents
engineers from working on the original version of a project in the vault. To
maintain the relationship between the drawing files that are defined in the
project file, check out all files specified in a project file to modify one or more
files. When edits are complete, the project can be checked back into the vault.
AutoCAD Vault ARX adds vaulting functionality to the Project Manager. Upon
initial start-up of AutoCAD Electrical, you are not logged into the vault. Log
into Autodesk Vault using the File Vault menu to vault projects. The vault
commands are available by right-clicking a project or drawing within the
AutoCAD Electrical Project Manager. You can use the Project Manager to:
Check projects in and out of the vault
The most basic requirement of the vault is that you never work directly
on a file in the vault. The projects in the vault are the Masters and cannot
be edited. Check out the project to the working folder on your local drive
156 | Chapter 3 Project Management