2011

Table Of Contents
6 Click OK Project-Wide.
7 Select drawings AEGS01 through AEGS05, and AEGS11 to process. Click
Process v.
NOTE Drawings AEGS01 through AEGS05 are supplied with the WD_TB
attribute on the title block for this exercise.
8 Click OK.
WD_TB attribute method | 1721