2011

Table Of Contents
3 Enter values:
Sheet: 11
Drawing: 0211
NOTE Drawing Description 1 and 2 were defined when the drawing was
created.
4 Click OK.
5 Save the drawing.
Title Block Update
1 If AEGS is not the active project, in the Project Manager, right-click AEGS
and select Activate.
2 In the Project Manager, double-click to expand the AEGS project.
3 Double-click drawing AEGS11 to open it.
4 Click Project tab Other Tools panel Title Block Update.
The Update Title Block dialog box displays.
5 Select the project and drawing values to update on the title block.
LINE1
LINE2
LINE4
LINE6
Drawing Description: 1 and 2
Drawing (%D value)
Sheet (%S value)
Sheet maximum
Resequence sheet %S values: 1
1720 | Chapter 23 Tutorials