2011

Table Of Contents
1 Click Schematic tab Edit Wires/Wire Numbers panel Modify Wires
drop-down Check/Trace Wire.
2 Select a wire on the network. You can select "A" to show All Segments. If
you prefer to step through wire by wire, press the spacebar.
3 Determine whether to pan or zoom the selected wire.
The connected wire segments endpoints are shown in the command
prompt area.
Check multiple wires
1 Click Reports tab Schematic panel DWG Audit.
2 Select whether to process the active drawing or the entire project, and
click OK.
3 Indicate which areas to check for errors. You can look for problems related
to missing wires segments which were linked through wire crossing gap
pointers. You can also clean up wires pointing to nonexistent wire
numbers and erase wire numbers that are not linked to a wire network.
Show all valid wire segments by having each outlined in temporary
graphics. Temporary graphics are shown as:
Bright red - regular wires
Magenta - wires on layers defined as No Wire Numbering.
4 Click OK.
The Drawing Audit utility displays a report of wire-related clean-up
functions that were performed.
Electrical audit
Detects problems related to wires and components, and describes the problems
in a dialog box on a series of tabs.
Ribbon: Reports tab Schematic panel Electrical Audit.
Overview of real-time error checking | 1689