2011

Table Of Contents
still check out the drawings available
for editing.
Adds the project definition file to the
vault and creates a version of the file.
Check In
Use this option if you want to check
in only the project definition file and
none of its drawing file dependencies;
otherwise use Check In All.
NOTE If files used to support the
project (such as .wdl and .wdt) share
the same file name as the project, they
appear in the Vault Check In dialog
box.
Reserves and locks the master project
definition file. Retrieves an updated
Check Out
copy, if necessary. Use this option if
you want to check out only the project
definition file and none of its drawing
file dependencies; otherwise use Check
Out All.
Removes the reservation/lock from the
master project definition file. The
Undo Check Out/Undo
Check Out All
master file is now available for others
to check out. Any modifications made
to the local copy are not checked back
into the vault.
Undo Check Out All removes the lock
from all the checked out drawing files
and project definition file listed in the
Project Manager for the selected pro-
ject.
Retrieves the latest master copy from
the vault and copies it into your
Get Latest/Get Latest All
working folder. The status indicator
displaying a red background indicates
older files.
150 | Chapter 3 Project Management