2011

Table Of Contents
selected project the active project and open the selected drawing or click
Back to return to the Recent Projects dialog box.
5 (Optional) Click Remove to remove a project from the project list.
6 Click OK.
The selected project becomes the active project.
NOTE If you know the drawing name but you are not sure what project the
drawing is in, click Find in the Recent Projects dialog box. In the Find Drawing in
Recent Projects dialog box, enter the name of the drawing (wildcards are accepted)
and click Find. Once a list of possible projects is presented, select the project name
and click Drawing List to see a list of the drawings contained in the project.
Double-click the drawing name in the list to preview the drawing. Click Pick Project,
Open Drawing to activate the project and open the selected drawing.
Project manager
Opens or creates a project of one or more drawings, and configures project-wide
settings.
Ribbon: Project tab Project Tools panel Manager.
Toolbar: Main Electrical 2
Menu: Projects Project Project Manager
Command entry: AEPROJECT
Lists the drawing files associated with each open project. Add new drawings,
reorder drawing files, and change project settings. Right-click the properties
icon for options to move, size, close, dock, hide, or set the transparency for
the Project Manager.
You can dock the Project Manager into a specific location on the screen or
hide it until you want to use the project tools. Right-click the properties icon
to display options to move, size, close, dock, hide, or set the transparency for
the Project Manager.
NOTE You cannot have two projects open in the Project Manager with the same
project name.
Overview of projects | 145