2011

Table Of Contents
Displays the results of the report generation. The dialog box options that are
available depend on which report you are creating.
Schematic Reports
Ribbon: Reports tab Schematic panel Reports.
Toolbar: Main Electrical 2
Menu: Projects Reports Schematic Reports
Command entry: AESCHEMATICREPORT
Specify whether to process the project, the active drawing, or selected
components, and click OK
Panel Reports
Ribbon: Reports tab Panel panel Reports.
Toolbar: Panel Layout
Menu: Projects Reports Panel Reports
Command entry: AEPANELREPORT
Specify whether to process the project, the active drawing, or selected
components, and click OK
Header
Displays the selected items at the top of each section in the report.
Displays the header information inside the report. Select to add
the time/date, a title line, project lines, or column labels.
Add
Displays the selected header item at the top of the first section
only. The header information is no longer displayed at the top
of each section.
First Section Only
1324 | Chapter 18 Reports