2008

Table Of Contents
"From" device's installation code (must end with "1")INST1
"From" device's location code (must end with "1")LOC1
"From" device's component tag ID (must end with "1")CMP1
"From" device's wire connection terminal number (must end with
"1")
PIN1
"To" device's installation code (must end with "2")INST2
"To" device's location code (must end with "2")LOC2
"To" device's component tag ID (must end with "2")CMP2
"To" device's wire connection terminal number (must end with
"2")
PIN2
Cable tagCBL
Cable wire or cable core colorCBLWC
Drawing list data fields to display
Changes what data fields are reported and the order in which they appear.
Access:
In the Project Manager, right-click the project name and select Drawing List
Report. Run the report and click Change Report Format on the Report Generator
dialog box.
In the Project Manager, right-click the project name and select Drawing List
Report. Run the report and click Change Report Format on the Report Generator
dialog box.
Lists the available fields for formatting the report (including
user-defined attributes). Select a field from the list to
transfer it into the Fields to Report list.
Available Fields
Generate reports | 819