2008

Table Of Contents
2 For all subsequent drawings:
Select to use the next sequential
reference.
Select Skip, drawing to drawing
count to enter an amount to skip for
the next drawing's first ladder refer-
ence.
Moves ladder references up if drawings have been
added to the middle of a project or moves ladder
Bump Up or Down
references down if drawings have been removed
from the project.
NOTE Enter a negative number to move ladder ref-
erences down.
Sheet (%S value)
Automates resequencing the sheet value on consecutive drawings.
Enter a number to start the resequencing.Resequence - Start with
Select to move the current sheet value up or down
by a given count.
Bump-Up/Down by
Drawing (%D value)
Performs a project-wide update of the drawing's %D DWG NAME parameter.
Other Configuration Settings
Updates the drawing parameters related to component, cross-reference and
wire tagging modes and format project-wide.
Title Block Update
Automates updating title block information for the active drawing or the
entire project drawing set.
Project-wide update or retag | 699