2008

Table Of Contents
The master file is checked out to you and the version you are working on is the
same as in the vault.
File is checked out to you, but the version you are working on is newer than
the latest version in the vault. This typically means that you made changes to
the model since the last time you checked out the file, but have not checked it
back in.
File is checked out to you, but the version you are working on is older than the
master file in the vault. This typically means that you started with a version for
the vault that was older than the latest, and checked it out to promote it to the
latest.
File is checked out to another user, and the version you are working on is the
same as in the vault. Also referred to as the Latest Version. This typically happens
if the other user did not check changes back into the vault.
File is checked out to another user, and the version you are working on is newer
than the file in the vault. This typically happens if the user checked in changes
to the vault, but kept the file checked out. Use Refresh from Vault to update to
the latest available version.
File is checked out to another user, but the version you are working on is older
than the latest version in the vault, and another user checked out this file. Use
Refresh from Vault to update to the latest available version.
File is locked and the local copy of the file is the same as the master file in the
vault.
File is locked and the local copy of the file is newer than the master file in the
vault.
File is locked and the local copy of the file is older than the master file in the
vault.
Create new project
48 | Chapter 2 Project Management