(you must be logged into the vault) Allows you to browse
to the vault to open a project and make it active inside of
Open Project from Vault
the Project Manager. In the Select Project dialog box,
navigate to the project to open and select it. Click the arrow
next to the Open button and select one of the following
options: Open (Check Out), Open (Check Out All), or Open
Read-Only.
Buttons
Creates a new project. Once created, the new
project automatically becomes the active project.
New Project
Creates a new drawing file and adds it to the
active project.
New Drawing
Refreshes the drawing list inside of the Project
Manager.
Refresh
For Vault: Checks for changes in external file
references and updates the Vault icons in the
Project Manager. Files that have changed and
are currently checked out to you are not up-
dated. Files that are checked out to another user
are updated to their current version. Files that
are checked out to another user are updated to
their current version on your local drive. If the
Vault version is newer, then the Vault icon indic-
ates that the file needs reloading (the Vault icon
turns red).
Performs pending updates on any drawing files
inside of the active project that have been mod-
ified.