2008

Table Of Contents
2 In the Select file dialog box, navigate to the project definition file, and
then select it. To maintain the relationship between the drawing files
that are defined in the project file, you must check out all files specified
in a project file when opening a project from Vault.
3 Click Open.
Get latest version
Get Latest Version retrieves a read-only copy of the most recent design data
that is checked in. You cannot modify it until you check it out using Autodesk
Vault Explorer or the Vault add-in for AutoCAD-based products.
1 In the Project Manager, select a file.
2 Right-click and select:
Get Latest Version to get the most recent version of the selected project
file.
Get Latest Version for All to get the most recent version of the selected
project file and all of the related files.
3 In the Get Latest Version dialog box, click OK.
The most recent versions of the selected files are downloaded from the
vault. If the working copy of a file is newer than the most recent version
of the file in the vault, you are prompted to chose either losing changes
made to the current working copy or to not get the latest version of that
file.
4 Click Settings to get the parents and children of the selected file.
Get previous version
Get Previous Version retrieves a past version of a file or a project and places
a read-only copy in your working folder. Historical versions can never be
modified. You can only create a new version of a file.
1 In the Project Manager, right-click a file or project, and then click Get
Previous Version.
2 In the Get Previous Version dialog box, select a version of the file or
project to retrieve.
3 If the file has parents and children to get, click Settings, and then specify
which related files are retrieved as well.
4 Click OK.
Use Autodesk Vault with AutoCAD Electrical | 1253