2008

Table Of Contents
status, attribute, old value and new value are all displayed. The 'x' indicates
that the source of the change no longer matches the task list.
Sorts the list of tasks to be performed. You can specify four sorts
to perform on the list.
Sort
Selects all of the tasks in the list. When you click OK, all of the
pending tasks will be performed on the selected drawings.
Select All
Removes the selected task from the list.Remove
Files unavailable for processing
If some of the drawings selected for processing are unavailable (such as in a
read-only state) this dialog displays. The file name, status, and location of the
drawing is listed in the dialog for review.
Tries to gain full write access to the entire list of drawing files
previously selected. If you gain full access, the files are locked out
Retry Now
by you and other users cannot make any modifications until the
project-wide command finishes.
Tasks (saves) all modifications in a task list to be run at a later
time. The task list is maintained inside of the Project Task List
Task
database file (project_update.mdb). Not all commands can write
to the task list. See the list below of commands that can be tasked.
Cancels the update and returns to the Select Drawings to Process
dialog box. Select other files to update or try to gain write access
to the entire list of drawings to process.
Cancel
Processes the command on the drawings that are available for
editing. Changes to unavailable drawings are not saved to the
task list for later updates.
Ignore
92 | Chapter 2 Project Management