2008

Select 01 Floor (2), right-click, and click Rename.
Enter 02 Floor, and press ENTER to rename the construct.
Using the same method, rename the other copies 03 Floor and 04 Floor.
3 Place a callout in the 01 Plan view to define and generate a section view:
On Project Navigator, click the Views tab.
Under Views, double-click 01 Plan view.
On the Getting_Started tool palette, click the Section Mark A2T tool.
If necessary, on the application status bar, click ORTHO to turn it on.
Beginning in the upper-left corner of the building, specify a point to the left of the exterior storage
room window for the start point of the section line.
Move the cursor to the right, and specify a point past the stair in the stairway and in front of the
exterior door.
Move the cursor down, and specify a point in the corridor, in front of the door to the horizontal
corridor.
Move the cursor to the right until it cuts through the middle window in the exterior wall of the
conference room, and specify the endpoint of the section line outside the building.
Press ENTER.
Move the cursor up, and specify a point above the building view to define the section view extents.
On the Place Callout worksheet, select Generate Section/Elevation, and Place Titlemark.
Under Create in, click New View Drawing.
On the Add Section/Elevation View, click the Name field, and enter Building Section.
Click Next.
For Levels 1-5, select Division 1, and click Next to include all 5 floors of the building in the section
view.
Under Constructs, select all the constructs except 01 Space Plan, and click Finish.
Specify a point above the floor plan in the 01 Plan view to generate the section view.
4 Open the new section view:
On the Project Navigator, under Views, double-click Building Section.
On the Navigation toolbar, click the Zoom flyout, and click .
32 | Chapter 1 Getting Started