2008

15 Add spaces to the floor plan:
Click Format menu Options.
On the AEC Setting tab, under Space Settings, verify that Automatically update associative spaces is
selected, and click OK.
On the Getting_Started tool palette, click the Reception space tool.
On the Properties palette, under General, for Style, verify that Reception is selected.
For Tag, select Aec7_Space_Tag [M_Aec7_Space_Tag].
For Create type, select Generate.
For Associative, verify that Yes is selected.
Under Generate Space, for Filter boundary set, select Aec objects, lines, arcs, polylines, and circles.
Under Component Dimensions, for Geometry type, select 2D.
Move the cursor into the reception area, and click to create a space.
Continue to add the other spaces on the floor plan, using the appropriate space tools.
16 On the drawing window status bar, select the Low Detail display configuration.
This display configuration displays the spaces with colored hatch patterns and reveals some of the hidden
and misplaced space tags.
17 Reposition the space tags as necessary.
18 Save and close the 01 Floor construct.
Next, schedule the doors and windows on the floor plan.
Creating Schedules
In this exercise, you schedule the doors and windows on the first floor of the building. Schedules and other annotation
are typically placed in view drawings within the project, so you must create a view that externally references the 01
Floor construct before you can create the schedules.
After you create the view, you tag the doors and windows in the view. The tags let you extract property set data from
the doors and windows. This data is reported in door and window schedules, which you create after you place the tags.
Creating Schedules | 23