2009

See also:
Key Info (Advanced) Rollout/Dialog on page 3131
Procedures
To set the tangent type for a key:
1 Select an object and open the Key Info (Basic) rollout.
2 Use the arrows in the upper-left corner of the dialog to select a key.
3 Choose a tangent type from the In or Out tangent flyouts.
Interface
Key number Shows the current key number. Click the right or left arrows to
go to the next or previous key.
Time Specifies at what time the key occurs.
Time Lock Prevents horizontal key movement in Track View Edit modes.
Value Adjusts the position of the selected object at the current key.
3128 | Chapter 15 Animation