2008

3 On the Schematic View toolbar, click the Connect button.
4 In the Schematic View window, drag from the child object to the parent.
A dotted line follows your cursor. Click to set the linkage.
If you are in Hierarchy mode, the children will arrange themselves
into an indented list under the parent as you create linkages.
To assign controllers with Schematic View:
1 On the Schematic View toolbar, click Display.
The Display floater appears. It lets you control what you see in the
Schematic View window.
2 On the Display floater, in the Relationships group, click Controllers. In
the Entities group, click Controllers as well.
The buttons indent to show they are active. The Transforms now appear
in the Schematic View window.
3 In the Schematic View window, select the transform of the object you
want to assign a controller to.
4 Right-click the transform, from on the Tools quad, choose Assign
Controller.
5 Choose the controller you want to apply from the list, then click OK.
To wire parameters with Schematic View:
1 Using the Display Floater, turn on Param Wires in the Relationships
group.
2 In the Schematic View window, select one of the objects you want to
wire.
3 Right-click the selected object and choose Wire Parameters.
4 In the pop up that appears select the component you want to wire, either
a Transform or an Object parameter, for instance.
5 Drag to the other object you want to wire to.
6 Again in the pop up that appears, select the component you need to wire
to.
7198 | Chapter 21 Managing Scenes and Projects