Service manual

3 Installation and Operation
SAM4S ER-900/SPS-300 SERIES 3-7
Figure 3-5 Spool Installation (2-Station)
3-3 Installation
3-3-5 Installation of MSR Assembly
Caution :
· Before installation, be sure to turn off the power switch.
· Use gloves to protect your hand from being cut by the angle and the chassis.
· Connect all the cables correctly. When connecting or disconnecting the cables, be careful not to apply
stress to the cables. (It may cause disconnection)
· Be careful not to bind interface cables and AC power cord together.
1. Take off the area (MSR assembly area) shown in the Figure 3-6-
1
by using a (-) shaped screw driver.
2. Figure 3-6-
2
shows the difference before and after.
Figure 3-6 MSR Installation (1)