Specifications

Test Procedure
VISUAL INSPECTION STAGE
1. Physical checks
All screws for tightness (esp. bridge rectifier and transistor bolts), referring to the
torque setting of the manufacturing tools
Capacitors for polarity
Earth connection for good contact, using multimeter (XLR GND to AC earth)
Power transistors for shorts to heat sink using a multimeter
All wiring points for good contacts (soldering and crimping)
PRETESTING
PRE TESTING SETUP REQUIREMENT
a) Oscilloscope
b) Variac
c) Multimeter
d) Load [4ohm]
e) Signal generator
f) Phantom power jig
2. Set up amplifier for test :
2.1. Fuse check
2 x AC fuses (2A), 20x5mm
1 x DC fuses (8A), 20x5mm
2.2. Connections
Connect amplifier to:
Variac (0Vac)
Signal generator (mic1, no signal)
Resistive load (4ohm on 4ohm terminal) with meters/oscilloscope
2.3. Reset controls:
Volume control to minimum
PR1 (preset) on the amplifier PCB CCW
3. Power up :
Turn on power switch and adjust voltage to 230VAC. Watch current meter for excess
current draw.
(P/F) Current shall not exceed 0.5Aac.
3.1. Voltages
Measure the following DC voltages with a multimeter referenced to mains safety
earth or the chassis.
(P/F)
Pass Range
DC power supply 47.5VDC – 55.0VDC
Input PCB rail (ICp8) 11.0.0VDC – 13.0VDC
Input PCB ½rail (ICp1) 5.0VDC – 6.0VDC
Input PCB gnd (ICp4) -0.1VDC – +0.1VDC
3.2. Bias setup
Put a multimeter across an emitter resistor.