Operator`s manual

Installation and Operator’s Manual Page 40 of 62
(PVI-2000-OUTD-UK
Rev: 1.0)
9 Third screen: measured insulation resistance and leakage current value.
9 Fourth screen: Output power and Voltage Input from the photovoltaic array
9 Fifth screen: Total energy exported to the grid (E-Total) and total operating
time (h-Total, that is time during which the unit was active). Both data are
measured since the unit was first operated.
9 Sixth screen: Time during which the unit exported energy to the grid
(Timegrid) and number of times that unit connected to the grid (Numgrid).
Pac ## W
Vin ## V
E-Total ## KWh
h-Total ## h
Timegrid hh:mm:ss
Numgrid ##
Riso #mOhm
Ileak