Service manual
STP 11-25R13-SM-TG
3 - 65
Performance Measures Results
g. Turn OFF R GAMMA and perform performance measure 8f for B GAMMA. P F
9. Perform performance measures 3 through 8 on all other cameras. P F
10. Perform multiple camera color matching using the split-screen method on the switcher
and monitors.
P F
11. Cap and place the cameras in STANDBY. P F
12. Initiate a DA Form 2407 for problems not corrected during setup. P F
Evaluation Guidance: Score the soldier a GO if all steps are passed (P). Score the soldier a NO-GO if
any step is failed (F). If the soldier fails any step, show what was done wrong and how to do it correctly.
Have the soldier practice until he can correctly perform the task.
References
Required Related
DA Pam 738-750
Mfg Manuals