Service manual
STP 11-25R13-SM-TG
3 - 56
Performance Measures Results
a. Designate all cables with heat shrink labels for new installations and self-
laminating labels for existing installations with the labels printed in the following
format:
P F
(1) Cable (number). P F
(2) From: (source equipment). P F
(3) To: (destination equipment). P F
b. Place cable designators as close to the actual point of connection as possible, but
do not install designators so they become hidden in a cable bundle.
P F
c. Remove all spare or unused cable where possible or clearly mark to determine
source and destination.
P F
8. Connect power to equipment. P F
9. Test system. P F
10. Adjust equipment controls and settings. P F
11. Correct deficiencies. P F
12. Annotate work completed on DA Form 2407. P F
Evaluation Guidance: Score the soldier a GO if all steps are passed (P). Score the soldier a NO-GO if
any step is failed (F). If the soldier fails any step, show what was done wrong and how to do it correctly.
Have the soldier practice until he can correctly perform the task.
References
Required Related
DA Pam 738-750 DOD AFRTS REP
Mfg Manuals TB 385-4