Service manual

STP 11-25R13-SM-TG
3 - 40
Performance Measures Results
7. Operations check; readjust or align as necessary. P F
8. Complete DA Form 2407. P F
9. Turn the DA Form 2407 into the supervisor. P F
Evaluation Guidance: Score the soldier a GO if all steps are passed (P). Score the soldier a NO-GO if
any step is failed (F). If the soldier fails any step, show what was done wrong and how to do it correctly.
Have the soldier practice until he can correctly perform the task.
References
Required Related
DA Pam 738-750 TB 385-4
Mfg Manuals