Service manual

STP 11-25R13-SM-TG
3 - 9
Performance Measures Results
b. Connect a 1 kHz tone from the ATSG to the DAT machine. Monitor the E-E level
on the VU meters and speakers.
P F
c. Insert a blank DAT and RECORD the 1 kHz tone. P F
d. PLAY back the recorded DAT and monitor for glitches. P F
e. Test all controls and switches for proper function. P F
10. Complete the necessary maintenance forms. P F
a. Annotate DD Form 314 to indicate the PMCS performed. P F
b. Document uncorrected faults and parts required on DA Form 2404; if no fault
exists, date and initial the form.
P F
c. Initiate a DA Form 2407 for any discrepancy not corrected during the PMCS. P F
Evaluation Guidance: Score the soldier a GO if all steps are passed (P). Score the soldier a NO-GO if
any step is failed (F). If the soldier fails any step, show what was done wrong and how to do it correctly.
Have the soldier practice until he can correctly perform the task.
References
Required Related
DA Pam 738-750
Mfg Manuals