User`s guide
M1 System Management Board User’s Guide 41
5
Demonstration Scripts
The scripts in this chapter demonstrate some of the basic functions of the board and the System Management software,
including the following:
• General setup
• Basic controls
•Voltage monitoring
• Current monitoring
• Temperature monitoring
•RTC control
• Logging events
General Setup
This section describes how to set up the System Management board and software using an external power supply brick.
1. Connect the ATX power supply to the white connector labeled “ATX input power supply” (Figure 5-1, Figure 5-2
on page 41, and Figure 5-3 on page 42).
Figure 5-1. ATX Power Supply Connector (female)
Figure 5-2. Standard ATX Power Supply Connector (male)