Installation manual
69 ATTO Technology Inc. ATTO Utilities Installation and Operation Manual
a.Changes to NVRAM settings require a system restart to take effect.
b. Refer to the switch documentation for details.
Error
Message
Occurs On...
Explanation Recommended Action
“The FC link is
down”
Create
The physical link is
down on the selected
channel.
• Verify that a working SFP is installed in the
selected channel and the Fibre Channel
cables are properly connected.
• Verify that the Data Rate NVRAM setting for
the selected channel is either Auto or set to
a speed that the switch supports.
a
• Verify that the Connection Mode NVRAM
setting for the selected channel is either PTP
or PTP Preferred.
a
• Verify that the speed and topology settings
for the switch port match those of the
selected channel.
b
“The WWPN
does not exist”
Delete
The specified virtual
port does not exist on
the selected channel.
• Wait 10 seconds and retry the delete
operation.