Specifications
Purchase order no. 7/EDP/COMP/106 Dated : 30/09/2011
27
9.
The Unit rates for passive networking components and labour charges are as under, however
the payment of these shall be made as per actual.
S.
no.
Description of Networking Component (Passive)
UNIT PRICE
inclusive of
Excise,
Custom
Duty,
Insurance,
Installation
&
Commissioi
ng Charges
CST/ST
(In
Figure)
Service
Tax (In
Figure)
Total Unit Price
F.O.R Destination
incl. of CST/ST,
Service Tax,
Freight
&Forwarding,
Custom Duty,
Insurance,
Installation &
Commissioing
Charges etc.
o) CLAMPS 10 0.50 0 10.50
p) BLANK PANEL 500 25.00 0 525.00
q) LC-SC Patch Cords duplex 3M/10Ft Multimode 1040 52.00 0 1092.00
r) SC CONNECTOR SM 220 11.00 0 231.00
s) SC COUPLER FOR COUPLING SM 180 9.00 0 189.00
t) LC-SC PATCH CORD 3M/10FT SM 1040 52.00 0 1092.00
u) BUFFER TUBBING KIT 2000 100.00 0 2100.00
v) AVAYA/EQ. CERTIFICATION PER NODE (UTP) 200 0 20.60 220.60
w) FIBRE CERTIFICATION PER CORE 400 0 41.20 441.20
JOB DESCRIPTION/LABOUR WORK
a) LIU FIXING 100 0 10.30 110.30
b) CONNECTRIZATION OF FIBRE 300 0 30.90 330.90
c) JACK PANEL FIXING 150 0 15.45 165.45
d) RACK PANEL FIXING wall mount 150 0 15.45 165.45
e) FIBRE OPTICS CABLE LAYING(UNDERGROUND) /
CRIMPING/ CONDUITING CHARGES INCL GI PIPE
(GRADE-B)/m
150 0 15.45 165.45
f) FIBRE OPTICS CABLE LAYING(UNDER THE ROAD) /
CRIMPING/ CONDUITING CHARGES INCL GI PIPE
(GRADE-B) /m
190 0 19.57 209.57
g) FIBRE OPTICS CABLE LAYING(OVERHEAD) /
CRIMPING/ CONDUITING CHARGES /m
120 0 12.36 132.36
h) UTP CABLE LAYING , CRIMPING / CONDUITING
CHARGES INCLUDING PVC PIPE. FITTING ETC./m
20 0 2.06 22.06
i) UTP CABLE LAYING (UNDER GROUND), CRIMPING/
CONDUITING CHARGES INCLUDING GI PIPE (GRADE-
B), FITTINGS ETC./m
140 0 14.42 154.42
j) UTP CABLE LAYING (UNDER THE ROAD), CRIMPING/
CONDUITING CHARGES INCLUDING GI PIPE (GRADE-
B), FITTINGS ETC./m
180 0 18.54 198.54
k) FIBER SPLICING Per Core 350 0 36.05 386.05
The above prices are FOR destination, inclusive of excise, customs duty, CST/ST, service tax,
Insurance, Installation, testing and commissioning at site, freight handling & forwarding as per the
present rate of taxes. The octroi / other duties & taxes, if any, shall be paid extra as per actual as per
Clause 8(b) of Annexure-XII.
2. SCOPE
2.1 HARDWARE & SOFTWARE
2.1.1 This scope covers design, manufacture/assembly, testing at supplier’s works before despatch,
supply and installation/commissioning of the equipment (Servers, Routers, Switches, UPS and
other connected equipment and System Software) for installation at various BBMB offices &
integration of these in the existing LAN/WAN (The present schematic network diagram is
attached at Annexure-I) .
The broad scope of work to be undertaken shall be
a) To supply, install and commission the Servers, Software, Networking Equipment, UPSs & other
equipment.
b) To set up and commission the Local Area Network segments including laying, crimping and
terminating of the OFC and UTP Cables.. The proposed network diagram is placed at
Annexure-II. The OFC network segments to be laid at Slapper are placed at Annexure-III. The
estimated plan for laying UTP cables at various locations is placed at Annexure-IV. The
specification for network cabling is placed at Annexure-V.
c) The wireless based network connectivity is being proposed for various BBMB offices where
leased line links are not feasible e.g. between BBMB Computer Centre Nangal & Bhakra
powerhouses, BBMB Computer Centre Talwara & Pong Power House etc through a separate
service provider. The configuration for these LAN Segments into the BBMB LAN/WAN setup
shall have to be installed/ commissioned. The proposed wireless connectivity diagram is placed
at Annexure-VI.
d) All the necessary settings in the software/Hardware for setting up & commissioning of extended
LAN segments shall be part of the work.