Installation Sheet

- 10 -
ATO-8B12G
(NG)
ATO-12G8B
(NG)
Natural
Gas 5
NG45
NG42
NG45
NG39
8
1
2
275,000
25,000
27,000
21000
27,000
ATO-8B12G
(LG)
ATO-12G8B
(LG)
Propane
10
LP54
LP52
LP54
LP52
259,000
23,000
27,000
21000
27,000
ATO-6B24G
(NG)
ATO-24G6B
(NG)
Natural
Gas 5
NG45
NG42
NG45
NG39
6
1
1
2
252.,000
25,000
27,000
21000
27,000
ATO-6B24G
(LG)
ATO-24G6B
(LG)
Propane
10
LP54
LP52
LP54
LP52
240,000
23,000
27,000
21000
27,000
ATO-4B36G
(NG)
ATO-36G4B
(NG)
Natural
Gas 5
NG45
NG42
NG45
NG39
4
2
1
2
229,000
25,000
27,000
21000
27,000
ATO-4B36G
(LG)
ATO-36G4B
(LG)
Propane
10
LP54
LP52
LP54
LP52
221,000
23,000
27,000
21000
27,000
ATO-2B48G
(NG)
ATO-48G2B
(NG)
Natural
Gas 5
NG45
NG42
NG45
NG39
2
3
1
2
206,000
25,000
27,000
21000
27,000
ATO-2B48G
(LG)
ATO-48G2B
(LG)
Propane
10
LP54
LP52
LP54
LP52
202,000
23,000
27,000
21000
27,000
5. Transport and Storage
In the process of transportation, handle carefully and keep upright to
prevent damage of the product packing. Wrapped equipment should not be in
open air for a long time, and shall be placed in a well-ventilated and
non-corrosive gases warehouse. When equipment needs temporary storage,
rainproof measures should be taken.