Specifications

•53
Final Check
Final Check
1.
1.
Water test the quick disconnect assembly in both connected and
Water test the quick disconnect assembly in both connected and
disconnected condition for leaks.
disconnected condition for leaks.
2.
2.
Check SS1 for proper operation of pneumatic inflation, oral
Check SS1 for proper operation of pneumatic inflation, oral
inflation, and deflation.
inflation, and deflation.
3.
3.
Check regulator inhalation and exhalation.
Check regulator inhalation and exhalation.
4. Fully inflate BCD, check all hose connections for tightness
4. Fully inflate BCD, check all hose connections for tightness
and
and
leaks.
leaks.