User Manual
1413
G. INTEGRATED OPERATION
OF 2 OR MORE SIGNALS
To add integrated signal operation of two or more signals,
you need to plug in the modular Atlas Model Signal Cable
(Items #230-232) in the length that is appropriate for your
block size. The cable is available in lengths of 7’, 15’ and
25’.
Plug one end of the signal cable into J1 of the SCB1. The
other end will go into J2 of SCB2. Repeat for every signal.
Installation of the integrated Signal Cable automatically dis-
engages the timed yellow aspect. There is also no need to
connect the YIN terminal for full prototypical operation. All
aspects are now under full control of the blocks and signals
in front of and behind your train.