User`s guide
Positioning and Leveling a Single-Rack System
007-4701-003 211
Positioning and Leveling a Single-Rack System
Caution: To avoid ESD damage to the electronic components, be sure to position the rack before
you remove the ESD bag that covers the rack assembly.
To position and level a single-rack system, follow these steps:
1. Grasp the rear of the rack and roll the rack to its designated location.
2. Remove the ESD bag.
3. If you are installing a tall rack, adjust the leveling bolts, as shown in Figure C-7, until the
rack is level.
Figure C-7 Leveling Bolts
4. Ensure that the circuit breaker on the power distribution unit is in the OFF (O) position. Then
connect the power cord to a grounded power outlet. Plugging in the power cord grounds the
rack.
!