User`s guide
Connect the gas supply line to the carrier in port on the rear panel of
the TD.
1. Ensure the transfer line has been connected correctly to
the GC. See Installing the Heated Transfer Line on page
51.
2. Set the carrier gas delivery pressure to 90 psig (620
kPa). See Connect to the ATD/TD Gas Supply System on
page 69.
3. Open the PNU tab and adjust the pressure regulator to
obtain the required head pressure. You can view the
head pressure on the touch screen display, by checking
the Show Actual box.
4. To determine the flow rate, connect a flow meter to the
column outlet on the GC. Refer to the flow rates table,
Appendix D Carrier Gas Pressures on page 388.
5. Adjust the carrier gas control until you have obtained
the desired head pressure or flow rate for the column.
Refer to your GC manual for details and reference
tables.
Setting the Desorb and Inlet Split Flow Rates
for the Manual Pneumatics TurboMatrix
Series 100 TD and 150 ATD
The Adjust Inlet Split command will move a tube into the carrier
gas system, rotate the heated valve and then open the valves
controlling the tube desorption and inlet split flow so that you can
adjust a needle valve on the ATD/TD to obtain the required flow
settings. See Setting Sample Split Ratios on page 228 for details of
determining the value of the split flow rates.
The desorb flow and inlet split flow may be inter-dependent.
Adjusting one may directly affect the other. Set the inlet split flow
first and then set the desorb flow. Check the inlet flow again. You
WARNIN
G
Do not set the delivery pressure higher than 100 psig
(690 kPa).