User`s guide

Installation and Setup
74
compression fitting with which to connect the regulator
to the TD. The delivery pressure must be adjustable to
90 psig (620 kPa).
2. The connections for the gas lines are located at the rear
of the instrument.
3. Connect a moisture filter, as close as possible to the
ATD /TD .
4. Connect the supply line to the Dry Air In port. The
purge connection at the rear of the instrument is a 1/8”
compression fitting.
NOTE: Connect your instruments to the dry air supply using 1/8
OD metal tubing.
5. Securely tighten all fittings.
6. Open the tank and set the delivery pressure to between
70 and 90 psig (620 kPa).
WARNIN
G
Do not set the delivery pressure higher than 100 psig
(690 kPa).