User`s guide

Installation and Setup
67
5. Place the 1/16” stainless steel nut (P/N 0497-2824) and
a 0.5-mm graphitized, Vespel Ferrule (P/N 0497 2066)
on the silica line at the ATD/TD end. After passing the
column end through the ferrule cut off a further 0.5cm of
fused silica to avoid the possibility of a blockage.
Withdraw the silica line and stainless steel sleeve from
the transfer line, so that the free end of the silica line can
be pushed into the heated valve with 3.5 cm of silica line
entering into the valve. Tighten the union nut just
enough to avoid leakage.
6. In the GC oven, cut the fused silica line within reach of
the union. Cut the line at least 1 cm (3/8“) from the end
of the fused silica using a wafer scribe (P/N N930-1386)
or other column cutting tool. Break off the tubing at the
score mark making sure that the break is clean and
square. Examine the cut with a magnifying glass and
compare it to Figure 10.
Figure 12 Oven Configured for a Packed Column
7. Place a 1/16” stainless steel nut (P/N 0497-2824) on the
fused silica line. Connect the fused silica line to the
union using either a graphitized Vespel ferrule (P/N
Bracket
Fan Guard
Silica Transfer Line
(P/N L116-1484)
Part of Transfer Line
Assembly
(P/N L427-0004)
Braze Assembly,
9000 LSC Injector
(P/N N610-0188)
8-32 x 3/8“ Stainless Steel
Pan Head Screw (P/N 0000-2057)
0.8 mm Union
(P/N 0992-0145)
Hairpin Cotter
(P/N 0992-3058)
Oven Sensor
Retaining Clip
Oven
Sensor
Packed Column
Hairpin Cotter
(P/N 0992-3058)