User`s guide
Installation and Setup
57
Installation at the ATD/TD
1. Disconnect the ATD/TD from the electrical supply.
Allow heated zones to cool.
2. If you are installing on a TD you can obtain the required
access by opening the front door.
3. If you are using an ATD you must first remove the two
front covers to expose the front of the instrument.
4. Remove the top (curved) cover from the ATD/TD (two
screws accessed from behind).
5. Remove the upper heated block from just above the
valve. See Figure 8.
6. Unscrew the two screws holding the clamping strip for
the heated line and remove the clamping strip.
7. During this next procedure take care to support the
weight of the transfer line to avoid damaging it. You
may need an assistant to hold the weight of the line.
Position the transfer line assembly so that the stainless
steel projection is located properly just above the valve
area and clamp in place with the clamp strip and two
screws. There should be adequate clearance between the
upper valve fitting and the end of the transfer line to
allow the transfer line fused silica to be eventually
connected. The electrical connection should rest in the
groove provided and project to the right of the area.
8. Reattach the upper curved cover to hold the insulated
section of the transfer line securely.
Installation of the F.S. Transfer Line, Sulfinert® Coated
Transfer Line Adapter or Analytical Column
WARNIN
G
You must allow 20 to 30 minutes for the heated blocks to cool
before handling any internal parts. Severe burns may result
from touching the heated blocks before they have cooled.